Permits Handled Before We Break Ground

Working near a wetland, pond, coastal bank, or dune? Most Cape projects within 100 feet need a Conservation Commission filing first. We handle the applications, the hearings, and the conditions, so your project gets approved and stays compliant.

  • Conservation Commission filings (RDAs & NOIs)
  • Hearings and site visits attended for you
  • Work done to the Order of Conditions
(508) 398-8151

Get a Free Quote

Give us a few details about your property and we'll follow up.

Why Permits Come First

Near the Water, the Paperwork
Comes Before the Shovel

Every town on Cape Cod has a Conservation Commission that enforces the Massachusetts Wetlands Protection Act along with its own local wetlands bylaw. If your project is within 100 feet of a wetland, pond, coastal bank, dune, or flood zone, or within 200 feet of a river, it usually needs a filing before any work starts.

Skipping that step can bring an enforcement order, and sometimes the work has to be undone or the area restored. We handle permitting as part of the project, so the approvals are in place before our crew arrives and the work is done the way the commission expects.

Ask About Your Project
Sandy path through beach grass on a Cape Cod dune

Does Your Project Need One?

Projects That Usually Need a Filing

If the work is close to any of these resource areas, it's worth checking before you plan anything else.

Patios, Walls & Walkways

New hardscape near a wetland or on a coastal bank, including retaining walls and steps down to the water.

Grading & Excavation

Moving soil, regrading, or site work within the buffer zone, where erosion can reach the resource area.

Clearing & Tree Removal

Cutting trees, clearing brush, or opening up views near ponds, marshes, and coastal banks.

Planting on Banks & Dunes

Even planting can fall under the commission's jurisdiction on a coastal bank or dune, especially when existing vegetation is removed.

Lawns & Drainage

New lawn areas, irrigation, and drainage changes close to wetlands or in a flood zone.

Not Sure?

When in doubt, ask before you plan the job. We'll measure the distance to the resource area and check with the town's conservation agent.

The Two Main Filings

RDA or NOI?

Most landscape projects near water go through one of these two filings. We figure out which one fits and prepare it.

Request for Determination of Applicability

RDA · for minor work

The simpler filing. It asks the commission to decide whether the project falls under its jurisdiction and whether a full permit is needed.

Common for small projects in the buffer zone, like modest plantings or minor hardscape set back from the resource area.

Notice of Intent

NOI · for larger work

The full application. It goes to a public hearing, abutters are notified, and an approval comes with an Order of Conditions that sets the rules for the work.

Common for larger hardscape, grading, clearing, and work on coastal banks or dunes.

How We Handle It

From Site Visit to Sign-Off

We manage the whole process, so you don't have to deal with the paperwork or the meetings.

  1. Assess

    Read the Site

    • Walk the property with you
    • Find the resource areas and buffer zones
    • Check with the conservation agent
  2. File

    Prepare the Application

    • Choose the right filing, RDA or NOI
    • Coordinate any site plans it requires
    • File ahead of the town's deadline
  3. Hearing

    Get It Approved

    • Attend the hearing and site visit
    • Answer the commission's questions
    • Adjust the plan if they ask
  4. Build

    Work to the Conditions

    • Erosion controls in place first
    • Work done as approved
    • Certificate of Compliance at the end

Local Conservation Commissions

Where We File Most Often

Each town runs its own commission, schedule, and local bylaw. These are the ones we work with most.

Yarmouth

Phone
508-398-2231 x1288
Meets
1st & 3rd Thursdays, 5:00 PM
Where
Town Hall Hearing Room, 1146 Route 28
Website
Yarmouth Conservation Commission

Yarmouth publishes its own wetland protection regulations under the town bylaw.

Dennis

Phone
508-760-6123
Meets
1st & 3rd Thursdays, 6:00 PM
Where
Town Hall Stone Hearing Room, 685 Route 134, South Dennis
Website
Dennis Conservation Commission

In Dennis, the conservation office signs off on a building permit before it goes to the Building Department.

Brewster

Phone
508-896-4546
Meets
2nd & 4th Tuesdays, 6:00 PM
Where
Town Hall, 2198 Main St (conservation office at 1657 Main St)
Website
Brewster Conservation Commission

Brewster enforces its own Wetlands Protection Bylaw alongside the state act.

Harwich

Phone
508-430-7538
Meets
Wednesdays, 6:00 PM (typically 1st & 3rd)
Where
Town Hall Griffin Room, 732 Main St
Website
Harwich Conservation Commission

Harwich enforces its own Wetlands Protection Bylaw alongside the state act.

Meeting schedules shift for holidays and summer, and each town sets its own filing deadlines. Check the town's agenda before counting on a hearing date, or let us track it for you.

Permitting

Frequently Asked Questions

Often, yes. Every Cape town has a Conservation Commission that enforces the Massachusetts Wetlands Protection Act and its own local wetlands bylaw. Landscaping within 100 feet of a wetland, pond, coastal bank, dune, or flood zone, or within 200 feet of a river, usually needs a filing before work starts. That can include patios, retaining walls, grading, clearing, and even planting on a coastal bank.
A Request for Determination of Applicability (RDA) is the simpler filing, used for minor work: it asks the commission to decide whether the project needs a full permit. A Notice of Intent (NOI) is the full application for larger work. It goes to a public hearing and, if approved, results in an Order of Conditions that sets the rules for how the work is done.
Yes. We assess the site, prepare and file the application, coordinate any site plans the filing requires, attend the hearings and site visits, and then do the work to the conditions of the approval. You don't have to deal with the paperwork or the meetings.
It depends on the town's hearing schedule and the type of filing. Most commissions meet once or twice a month, with filing deadlines ahead of each hearing. A minor project filed as an RDA is often decided at a single hearing. An NOI usually takes longer, and the Order of Conditions has to be issued and recorded before work begins. We'll give you a realistic timeline once we've seen the site.
We file most often in Yarmouth, Dennis, Brewster, and Harwich, and we know how each of those commissions works. Have a project somewhere else on the Cape? Ask us.
We build the project to the Order of Conditions, which can include things like erosion controls during the work and replanting afterward. For NOI projects, the last step is a Certificate of Compliance from the commission confirming the work was done as approved.

Planning Work Near the Water?

Tell us about the project. We'll find out what the town requires and handle it from there.